Oracle Primavera P6

Business software

Built when you ask for it

Sync Primavera P6 projects, activities and baselines. Ingest builds this connector the first time a customer asks for it, then keeps the tables current in a data warehouse you own, on the schedule you choose.

The Oracle Primavera P6 connector syncs projects, activities, baselines into analytics-ready tables in your data warehouse. Ingest builds it on request, handling auth, pagination and retries so the tables stay current.

What you would get

Each of these arrives as its own table, kept current on the schedule you choose:

  • Projects
  • Activities
  • Baselines

How it gets built

  1. Choose Oracle Primavera P6 when you set up a pipeline, with the warehouse it goes to and a schedule.
  2. Ingest reads Oracle Primavera P6's documentation, and you choose the tables you want.
  3. Ingest builds the connector and tests it against Oracle Primavera P6 itself.
  4. A person at Ingest reviews and publishes it, and your pipeline starts on its own.

What you will need

Username and password for an API user. Ask your Oracle Primavera P6 administrator for a dedicated API user with read access to the data you want synced, and enter its login in Ingest's form.

You enter it once, in a form in Ingest, and it is kept in a secret store set aside for your organization.

Questions

Does Ingest have a Oracle Primavera P6 connector?
Not as a finished connector yet. Ingest builds it from Oracle Primavera P6's own documentation the first time a customer asks, tests it against the real service, and lists it once it passes.
Which warehouses can Oracle Primavera P6 data go to?
Amazon S3, Google Cloud Storage, Azure Blob Storage, Apache Iceberg, Ingest Managed Lakehouse, MotherDuck, Postgres, Amazon Athena, Databricks, Redshift, BigQuery, ClickHouse, ObsessionDB, MySQL / generic SQL and Snowflake, in an account you own.
Do I need to write code?
No. Ingest builds, runs and maintains the connector. Someone with access to your warehouse connects it once, following a short guide.

Oracle Primavera P6 API documentation: https://docs.oracle.com/cd/F37125_01/

Setting up the destination is its own short guide, one per warehouse or lake: Amazon S3, Google Cloud Storage, Azure Blob Storage, Apache Iceberg, Ingest Managed Lakehouse, MotherDuck, Postgres, Amazon Athena, Databricks, Redshift, BigQuery, ClickHouse, ObsessionDB, MySQL / generic SQL, Snowflake.

Other sources Ingest connects for SaaS teams: Asana, OpenAI (ChatGPT Enterprise), Clockify, Google Drive, Google Sheets, Jira.

Request Oracle Primavera P6